Peabody Bathroom Extensions

This £1.4m 12-week programme used innovation to replace traditionally built bathroom extensions for Peabody residents. The 11 pods were pre-manufactured, craned in and connected to water, electricity and drainage supplies. This use of innovation is estimated to have saved the programme 12 weeks and reduced the impact on residents and the surrounding area.

Specification

• Pre- Built Steel Pods
• Deconstruction of Original Extension
• Plumbing and Electrical Works
• Brick Slip Cladding
• Drainage and Ground Works

Download our Case Study to find out more.